BHP iron ore production hit by train driver shortage

by | Oct 19, 2021

BHP Group on Tuesday reported a fall in first-quarter iron ore output due to a shortage of train drivers to ship the commodity as a result of Australian Covid-19 border restrictions.
Iron ore production was down 4% year on year 63.3m tonnes (mt) in the three months to September 30.

However, the world’s largest miner left its annual production outlook unchanged. Rival Rio Tinto last week cut its shipments forecast because of the tight labour market.

BHP was forced to ask train drivers to work more hours, as Australia remains subject to strict border restrictions between states. Workers usually fly in and out of mine sites from major cities.

Drivers transport iron ore from the key Pilbara region to Port Hedland for shipping. Much of the iron ore goes to steelmakers in China.

BHP said the worker shortage had improved in September.

Output at the petroleum business, which is set to be bought by Woodside Petroleum, rose 3% to 27.5m barrels of oil equivalent.

Metallurgical coal output dropped 9% to 8.9 mt, while thermal coal production jumped 17% to 4.2 mt.

Related articles

Ryanair passenger numbers jump 9% in December

Ryanair passenger numbers jump 9% in December

(Sharecast News) - Budget airline Ryanair reported a 9% jump in December passenger numbers on Wednesday. Traffic rose to 12.54 million from 11.52m in the same month a year earlier, while the load factor - which gauges how full the planes are - ticked down to 91% from...

Wizz Are passenger numbers soar in December

Wizz Are passenger numbers soar in December

(Sharecast News) - Hungary-based budget airline Wizz Air reported a strong rise in December passenger numbers as demand continued to rebound from the Covid pandemic. The company on Wednesday said it carried 4,964,857 passengers, an 18.8% increase year on year. For the...

Trending stories

Join our mailing list

Subscribe to our mailing list to receive regular updates!

x